| Job | Concrete floor in a new Asda store in Strabane |
|---|---|
| Main Contractor | Gilbert Ash |
| Concrete Supplier | J Barrett & Sons |
| Flooring Contractor | M R Concrete |
| Description | The concrete was placed in one continuous pour of approximately 1200 cubic metres in a 12 hour period. To create an easily placed and finished concrete, Chemcrete HP3 was added to the concrete to increase slump without increasing the water content. As a further measure to reduce drying shrinkage cracking, the floor was sprayed with Larcure ST curing membrane. |